View Categories

Post Checks and Completion

2 Docs

Post Checks

Last Updated: 17 September 2025

Post Install Checks

RTU Installation

Last Updated: 17 September 2025

RTU Installation 1. RTU – Once commissioned, fit a cable tie length ways along RTU avoiding the IMEI across the Molex plug. 2. Attach sticky pad to rear of RTU and attach to surface and hold for a minute for adhesive to hold. 3. Attach cable ties around RTU and secure location to ensure no...